top of page

Form and Function
Project 1
This Project is a visual representation of form and function in architecture. The goal of this project is to take an already existing bridge and incorporate a movement component from the movement analogies from a common household item.
The requirements for this project:
- 190' bridge span
- No members of the bridge can enter in the water.
- Movable components to allow a 40’ x 50’ object to pass through it
- Water is 10' below the road
- Bridge members no longer than 20' or higher than 100'
Original Bridge Prototypes

Morandi Bridge

Quebec Bridge

Riverside Swinging Bridge

Arch

Cantilever

Truss
Analogies

Ice cream Scooper


Wrench

Wine Bottle Opener


3x3 Table

Preliminary Designs

Closed

Open

Elevations

North

East

South

West
3D Views




3D Views of Movement Mechanism



Animation of movement mechanism

bottom of page